Planned, wave-based migration with a cost model agreed before the first workload moves — and a rollback path behind every cutover.
The technical move is the easy part. The planning, sequencing, and cost control are where migrations succeed or fail.
Every workload, integration, scheduled job, and forgotten server catalogued, so nothing is discovered mid-cutover.
Rehost, replatform, refactor, replace, or retire decided workload by workload against cost and risk, not applied uniformly.
Replication, dual-write windows, and verified backfills so cutover downtime is measured in minutes rather than weekends.
Accounts, networking, identity, and guardrails built as code, with a projected monthly bill signed off before the move.
Identity, network segmentation, encryption, and audit evidence mapped to cloud equivalents your auditors will accept.
Every wave rehearsed in a dry run with a timed, tested rollback before the production window opens.
Four phases that turn a migration from a high-stakes event into a repeatable routine.
Inventory, dependency graph, and a modelled cost comparison. You get a go or no-go recommendation with the numbers behind it.
Accounts, networking, identity, logging, and cost guardrails provisioned as infrastructure code before any workload arrives.
Low-risk workloads first to prove the runbook, then progressively more critical ones, each with a rehearsed cutover.
Right-sizing, reserved capacity, and old infrastructure switched off — the step that turns a migration into a saving.
Cloud-native services plus the automation that keeps the destination reproducible.
Different starting points, the same discipline about sequencing and rollback.
A lease ending or hardware refresh due, with a fixed deadline and no appetite for buying another rack of servers.
Workloads already on cloud virtual machines, costing more than on-premise and delivering none of the elasticity.
Consolidating after an acquisition, or relocating for pricing, compliance, or data residency reasons.
Growth or seasonal load that fixed capacity cannot absorb without permanent over-provisioning.
Cloud value comes from what you change during the move, not from the move itself.
A modelled bill agreed before cutover, with tagging and budget alerts so surprises show up in days rather than quarters.
Workloads that scale with demand instead of being sized for a peak that happens twice a year.
Backup and disaster recovery become configuration rather than a documented hope, with restore times actually measured.
A new environment provisioned in minutes from code, which changes how quickly your teams can test and release.
Migration is a risk-management exercise that happens to involve infrastructure.
Learn more about us →The assessment produces a real cost model. If the business case does not hold up, we say so before you spend the budget.
Every cutover has a rehearsed, timed rollback. We do not open a production window without one.
We hold no reseller margin on any provider, so the recommendation follows your workloads and your team's skills.
Old infrastructure switched off and optimisation done. Migrations that skip this step never deliver the saving they promised.
Cost, downtime, and what happens to the team running the current estate.
Book an assessment and we will map your workloads, model the cost, and give you an honest recommendation.
Book a Migration Assessment →